Internal remodelling and extensions to a secondary school sixth form specialising in Business and Enterprise to provide 150 additional places. Works included extending an existing basement and providing mezzanine floors within the existing building. The works were carried out within an occupied school and carefully planned and phased to cause minimum disruption.
Leytonstone School
The project scope included the following
Internal remodelling and extensions to a secondary school sixth form specialising in Business and Enterprise to provide 150 additional places. Works included extending an existing basement and providing mezzanine floors within the existing building. The works were carried out within an occupied school and carefully planned and phased to cause minimum disruption.